Start Each Day From Fai's Draft
Choose the days and the changeover you want between sets, and Fai builds doors, soundchecks, sets, changeovers and curfew from your schedule, stages, opening hours and advancing. Each drafted cue arrives with the departments that usually act on it. Keep what you want and leave the rest, and the saved cues show Drafted by Fai so your team can tell them apart. Days you have locked and sets that already have a cue are left alone.
Plan the days around the show from the same timeline. Add a build day before and a break day after, each starting with the usual cues of load-in, rig and sound check, or de-rig and load-out. Trader load-in times appear on the run of show for their day too, so site, production and stage teams all plan from one running order.
A conference works the same way. It starts with departments such as Audio-visual, Speaker liaison and Registration and front of house, and keynotes, Q and A sessions and walk-in music are kinds of cue. Add any cue with a start time, what happens and the stage, and Fai works out its kind from the name you enter, from doors to a pyro moment. A cue in the early hours after a late show stays on the show day it belongs to.
- Draft with Fai: doors to curfew from your schedule and advancing
- Departments on each cue: the teams who usually act on it
- Build and break days: load-in, rig, de-rig and load-out
- After midnight: late cues kept on the right show day











