---
title: "Keep a risk register for your event | Инструкции Ticket Fairy"
description: "List what could go wrong at your event, how likely and how bad each risk is and what you are doing about it, start from a draft Fai builds from your event and past incidents, and keep every risk's owner, review date and status current."
canonical: "https://www.ticketfairy.com/ru/guides/keep-a-risk-register-for-your-event"
---

# Keep a risk register for your event | Инструкции Ticket Fairy

1. [Ticket Fairy](https://www.ticketfairy.com/)
2. [Инструкции](https://www.ticketfairy.com/ru/guides)
3. Keep a risk register for your event

Управление продакшеном

# Keep a risk register for your event

Event managers and safety officers keep a risk register for licensing, insurers and their own peace of mind, usually as a spreadsheet nobody updates after the safety advisory group meeting. The register keeps each risk scored, owned and dated beside the incidents your team logs, with nothing ever deleted.

List what could go wrong at your event, how likely and how bad each risk is and what you are doing about it, start from a draft Fai builds from your event and past incidents, and keep every risk's owner, review date and status current.

Для кого:  Keeping your event's risk assessment current

Займёт:  6 минут

- [Open the risk register](#step-1)
- [Let Fai draft your risks](#step-2)
- [Add the risks you keep](#step-3)
- [Add a risk of your own](#step-4)
- [Record what you are doing and who owns it](#step-5)
- [Mark a risk controlled, accepted or closed](#step-6)

## Перед началом

- You are an owner, admin or producer on the event. The event's **Operations** page opens for those roles only.

1. ## Open the risk register

   Open the event, select **Operations**, then select **Risks** in the list of sections.

   **Примечание:** Each risk shows its score, owner, review date and status, highest score first; **Still open** leaves out closed risks. If Risks is not in the list, select **More sections** and open it there.
          ![Ticket Fairy risk register for a festival, with each risk's score, likelihood and impact, owner, review date and status](https://www.ticketfairy.com/embeds/posters/marketing-event-staffing--risks.png)    The risk register.
2. ## Let Fai draft your risks

   Select **Let Fai draft your risks**, check **People at the busiest time** and **Indoors or outdoors?**, then select **Draft again** if you changed them.

   **Примечание:** Fai drafts from your event type, size, dates and finish time, and from incidents at your earlier events, and says why each risk is on the list. Risks your register already covers are left out.
          ![Ticket Fairy dialog with Fai's draft risk list for an outdoor festival, each risk with its score, the reason it is listed and a tick box](https://www.ticketfairy.com/embeds/posters/marketing-event-staffing--draft-risks.png)    Fai's draft risk list.
3. ## Add the risks you keep

   Untick anything that does not apply, then select the add button, for example "Add 4 risks".

   **Примечание:** Nothing is saved until you add them, and each one shows **Drafted by Fai** on the register. You can change each one afterwards.
4. ## Add a risk of your own

   Select **Add a risk**, enter **What could go wrong?**, choose **How likely?** and **How bad would it be?**, then select **Add risk**.

   **Примечание:** The score is how likely times how bad, from 1 to 25: 15 or more is High, 8 to 14 Medium and 7 or less Low. It is worked out for you and never entered.
5. ## Record what you are doing and who owns it

   Select a risk, enter **What you're doing about it** one action per line, then set **Who owns it** and **Review by** and select **Save**.

   **Примечание:** Change how likely or how bad as your plans take effect, and the score follows. A teammate's save in the meantime is never overwritten; the form reloads their version for you to check.
          ![Ticket Fairy Edit risk dialog with what could go wrong, how likely, how bad, the score, what you are doing about it, type, owner and review date](https://www.ticketfairy.com/embeds/posters/marketing-event-staffing--edit-risk.png)    Edit a risk.
6. ## Mark a risk controlled, accepted or closed

   Select **Mark controlled**, **Accept** or **Close** on the risk's row.

   **Примечание:** Controlled means your actions are in place, and Accepted means you have decided to live with it. A closed risk can be brought back with **Reopen**, and every change is kept in its history.

## Попробуйте эти шаги на своём мероприятии

Создайте бесплатный аккаунт, настройте мероприятие и выполните шаги выше в своей панели управления. Это займёт несколько минут, и звонок с отделом продаж не нужен.

    Ваш адрес электронной почты    [Создать бесплатный аккаунт](https://manage.ticketfairy.com/welcome) [Заказать демо](https://www.ticketfairy.com/ru/event-ticketing/book-a-demo)

Без платы за подключение. Без обязательной ежемесячной платы. Банковская карта не нужна.

## Или поручите это помощнику

Fai reads the register, builds a draft from your event without saving it, adds risks one at a time or many at once, edits them and marks them controlled, accepted, closed or open again. She shows you each change and waits for your yes first; risks are never deleted.

### В вашей панели, с Fai

Draft a risk register for \<EVENT NAME\>, an outdoor festival for 8,000 people, and show me before you add anything

## Пусть Fai сделает это за вас

Fai работает внутри вашей панели Ticket Fairy. Создайте аккаунт, откройте Fai и вставьте запрос выше.

   [Создать бесплатный аккаунт](https://manage.ticketfairy.com/welcome) [Заказать демо](https://www.ticketfairy.com/ru/event-ticketing/book-a-demo)

Без платы за подключение. Без обязательной ежемесячной платы. Банковская карта не нужна.

## Вопросы, которые могут возникнуть

Can I delete a risk?:  No. Risks are never deleted, so your register keeps its history for licensing and insurers. Close a risk that no longer applies.

Is Fai's draft a risk assessment?:  It is a starting list for you to check. Follow your own risk assessment and the advice of your security and medical providers.

Why did Fai add a risk about a past incident?:  Incidents like it were logged at your earlier events, and the draft says how many beside the risk.

## Остался вопрос?

Запишитесь на демо, и мы ответим на него на звонке применительно к вашему типу мероприятия. Или создайте аккаунт и посмотрите сами.

   [Заказать демо](https://www.ticketfairy.com/ru/event-ticketing/book-a-demo) [Создать бесплатный аккаунт](https://manage.ticketfairy.com/welcome)

Без платы за подключение. Без обязательной ежемесячной платы. Банковская карта не нужна.

## Похожие руководства

- [Другие возможности Ticket Fairy](https://www.ticketfairy.com/features)
- [Report and handle incidents at your event](https://www.ticketfairy.com/ru/guides/report-and-handle-incidents-at-your-event)
- [Build your event rota and check staff in](https://www.ticketfairy.com/ru/guides/build-your-event-rota-and-check-staff-in)
- [Run your event from its Today page](https://www.ticketfairy.com/ru/guides/run-your-event-from-its-today-page)
- [Find any performer, stage or day on your event](https://www.ticketfairy.com/ru/guides/find-any-performer-stage-or-day-on-your-event)
- [Build the running order for your event day](https://www.ticketfairy.com/ru/guides/plan-your-event-production)
- [Отслеживайте бронирование каждого артиста на мероприятии](https://www.ticketfairy.com/ru/guides/book-and-brief-your-artists)
- [Не теряйте задачи по мероприятию](https://www.ticketfairy.com/ru/guides/keep-your-event-tasks-on-track)
- [Balance your event team's workload](https://www.ticketfairy.com/ru/guides/balance-your-event-teams-workload)
- [Read your event's email in one inbox](https://www.ticketfairy.com/ru/guides/read-your-event-email-in-one-inbox)
- [Take notes on your event calls with Fai](https://www.ticketfairy.com/ru/guides/take-notes-on-your-event-calls-with-fai)
- [Choose what Fai does on your event](https://www.ticketfairy.com/ru/guides/choose-what-fai-does-on-your-event)
- [Choose how your event emails look](https://www.ticketfairy.com/ru/guides/choose-how-your-event-emails-look)
- [Keep rider lists and notes for your event's artists](https://www.ticketfairy.com/ru/guides/keep-rider-lists-and-notes-for-your-artists)
- [Build a dressing-room shopping list from your event's artist riders](https://www.ticketfairy.com/ru/guides/build-a-dressing-room-shopping-list-from-artist-riders)
- [Advance your performers before the show](https://www.ticketfairy.com/ru/guides/advance-your-performers-before-the-show)
- [Set each performer's guest list, hotel and meal allowances for your event](https://www.ticketfairy.com/ru/guides/set-each-performers-allowances-and-travel-party)
- [Fill in each performer's advance for your event from tour books, riders and emails](https://www.ticketfairy.com/ru/guides/fill-in-advances-from-tour-books-riders-and-emails)
- [Keep track of where your event's artists and crew are staying](https://www.ticketfairy.com/ru/guides/book-travel-and-accommodation-for-your-artists)
- [Share your event's rooming lists with hotels and pickups with drivers](https://www.ticketfairy.com/ru/guides/share-rooming-lists-with-hotels-and-pickups-with-drivers)
- [Plan your artists' pickups with drivers and vehicles for your event](https://www.ticketfairy.com/ru/guides/plan-artist-pickups-with-drivers-and-vehicles)
- [Plan your run of show and who calls it](https://www.ticketfairy.com/ru/guides/plan-your-run-of-show-and-who-calls-it)
- [Check your running order for clashes before show day](https://www.ticketfairy.com/ru/guides/check-your-running-order-for-clashes-before-show-day)
- [Share day sheets with your event's on-site teams](https://www.ticketfairy.com/ru/guides/share-day-sheets-with-your-on-site-teams)
- [Call your show live on show day](https://www.ticketfairy.com/ru/guides/call-your-show-live-on-show-day)
- [Book dressing rooms and plan build and break days for your event](https://www.ticketfairy.com/ru/guides/book-dressing-rooms-and-plan-build-and-break-days)
- [Забронировать даты для мероприятий на площадке](https://www.ticketfairy.com/ru/guides/hold-dates-for-shows-at-your-venue)
- [Make an offer to an artist's agent for your show](https://www.ticketfairy.com/ru/guides/make-an-offer-to-an-artists-agent)
- [Handle the contract, invoice and riders an artist's agent sends for your event](https://www.ticketfairy.com/ru/guides/handle-the-contract-invoice-and-riders-an-agent-sends-back)
- [Settle a show with an artist after your event](https://www.ticketfairy.com/ru/guides/settle-a-show-with-an-artist)
- [Send your event contracts and get them signed online](https://www.ticketfairy.com/ru/guides/send-contracts-and-get-them-signed-online)
- [Raise purchase orders and track what your event owes](https://www.ticketfairy.com/ru/guides/raise-purchase-orders-and-track-what-your-event-owes)
- [Work out the backline and production to hire for your event](https://www.ticketfairy.com/ru/guides/work-out-the-backline-and-production-to-hire-for-your-event)
- [Send your event hire lists to suppliers](https://www.ticketfairy.com/ru/guides/send-your-hire-lists-to-suppliers)
- [Take food, drink and market trader applications for your event](https://www.ticketfairy.com/ru/guides/take-trader-applications-for-your-event)
- [Review act and talk applications for your event with your team](https://www.ticketfairy.com/ru/guides/review-act-and-talk-applications-with-your-team)
- [Get your traders ready for show day](https://www.ticketfairy.com/ru/guides/get-your-traders-ready-for-show-day)
- [Collect insurance and certificates from your event's outside teams](https://www.ticketfairy.com/ru/guides/collect-insurance-and-certificates-from-your-outside-teams)
- [Draw your event site map and share it](https://www.ticketfairy.com/ru/guides/draw-your-event-site-map-and-share-it)
- [Book delivery times for your event and check vehicles in at the gate](https://www.ticketfairy.com/ru/guides/book-delivery-times-and-check-vehicles-in-at-the-gate)
- [Issue accreditation passes for your event](https://www.ticketfairy.com/ru/guides/issue-accreditation-passes-for-your-event)
- [Let outside teams name their own people for event passes](https://www.ticketfairy.com/ru/guides/let-outside-teams-name-their-own-people-for-passes)
- [Choose who approves accreditation requests for your event](https://www.ticketfairy.com/ru/guides/choose-who-approves-accreditation-requests)
- [Recruit volunteers for your event](https://www.ticketfairy.com/ru/guides/recruit-volunteers-for-your-event)
- [Approve or decline accreditation requests for your event](https://www.ticketfairy.com/ru/guides/approve-or-decline-accreditation-requests-for-your-event)
- [Give your event volunteers their own page and track their hours](https://www.ticketfairy.com/ru/guides/give-volunteers-their-own-page-and-track-hours)
- [Hand out accreditation passes at your event desk](https://www.ticketfairy.com/ru/guides/hand-out-accreditation-passes-at-your-desk)
- [Give crew meals at your event meal desk](https://www.ticketfairy.com/ru/guides/give-crew-meals-at-your-meal-desk)
- [Hand out radios and kit to your event crew](https://www.ticketfairy.com/ru/guides/hand-out-radios-and-kit-to-your-event-crew)
- [Let outside teams order kit and equipment for your event](https://www.ticketfairy.com/ru/guides/let-outside-teams-order-kit-and-equipment-for-your-event)
- [Handle lost property at your event](https://www.ticketfairy.com/ru/guides/handle-lost-property-at-your-event)
- [Get hire suppliers to confirm orders and count deliveries for your event](https://www.ticketfairy.com/ru/guides/get-hire-suppliers-to-confirm-orders-and-count-deliveries)
- [Message the crew, volunteers and traders working on your event](https://www.ticketfairy.com/ru/guides/message-the-people-working-on-your-event)
- [Send your event lists to your team on a schedule](https://www.ticketfairy.com/ru/guides/send-your-event-lists-to-your-team-on-a-schedule)
- [Publish your event line-up and set times](https://www.ticketfairy.com/ru/guides/publish-your-line-up-and-set-times)
- [Ask attendees for feedback after your event](https://www.ticketfairy.com/ru/guides/ask-attendees-for-feedback-after-your-event)
- [Plan next year's event from your attendee feedback](https://www.ticketfairy.com/ru/guides/plan-next-year-from-your-attendee-feedback)
- [Hold hotel rooms for your event's artists and crew](https://www.ticketfairy.com/ru/guides/hold-hotel-rooms-for-your-artists-and-crew)
- [Give your event's unused hotel rooms back before the release date](https://www.ticketfairy.com/ru/guides/give-unused-hotel-rooms-back-before-the-release-date)
- [Sell hotel rooms to your ticket buyers from a hotel block](https://www.ticketfairy.com/ru/guides/sell-hotel-rooms-to-your-ticket-buyers-from-a-hotel-block)
- [Copy the setup of your last event into your next one](https://www.ticketfairy.com/ru/guides/copy-the-setup-of-your-last-event-into-your-next-one)
- [Compare your ticket sales with your last event](https://www.ticketfairy.com/ru/guides/compare-your-ticket-sales-with-your-last-event)
- [See the all-in cost of each act on your event](https://www.ticketfairy.com/ru/guides/see-the-all-in-cost-of-each-act-on-your-event)
- [See what your brand spends across its events](https://www.ticketfairy.com/ru/guides/see-what-your-brand-spends-across-its-events)
- [Show your traders in a directory on your website](https://www.ticketfairy.com/ru/guides/show-your-traders-in-a-directory-on-your-website)
- [Place your traders on pitches on your event site map](https://www.ticketfairy.com/ru/guides/place-your-traders-on-pitches-on-your-site-map)
- [Check your traders' takings after your event and invoice their share of sales](https://www.ticketfairy.com/ru/guides/check-trader-takings-and-invoice-a-share-of-sales)
- [Share a power sheet with your event electrician](https://www.ticketfairy.com/ru/guides/share-a-power-sheet-with-your-electrician)
- [Give exhibitors a lead scanner for their booth at your event](https://www.ticketfairy.com/ru/guides/give-exhibitors-a-lead-scanner-for-their-booth)
- [Let exhibitors follow up their event leads and see their results](https://www.ticketfairy.com/ru/guides/let-exhibitors-follow-up-their-leads-and-see-results)
- [Send event document packs to your performers, traders and crew](https://www.ticketfairy.com/ru/guides/send-document-packs-to-your-performers-traders-and-crew)
- [Send contracts to many performers, traders or suppliers for your event at once](https://www.ticketfairy.com/ru/guides/send-contracts-to-many-performers-traders-or-suppliers-at-once)
- [Offer open shifts on your event rota to crew and volunteers](https://www.ticketfairy.com/ru/guides/offer-open-shifts-to-your-crew-and-volunteers)
- [Find the crew and volunteers who work your events](https://www.ticketfairy.com/ru/guides/find-the-crew-and-volunteers-who-work-your-events)
- [Give your event crew one page for all their shifts](https://www.ticketfairy.com/ru/guides/give-your-crew-one-page-for-all-their-shifts)
- [Let event staff work a desk from their phone with a desk link](https://www.ticketfairy.com/ru/guides/let-event-staff-work-a-desk-from-their-phone)
- [Check accreditation passes in and out at your event staff gates](https://www.ticketfairy.com/ru/guides/check-passes-in-and-out-at-your-staff-gates)
- [Collect crew certificates and licences before they work an event shift](https://www.ticketfairy.com/ru/guides/collect-crew-certificates-before-they-work-a-shift)
- [Run a safety induction for everyone who works your event](https://www.ticketfairy.com/ru/guides/run-a-safety-induction-for-everyone-who-works-your-event)
- [Plan crew meal times and food needs for your event](https://www.ticketfairy.com/ru/guides/plan-crew-meal-times-and-food-needs-for-your-event)
- [Charge outside teams for the crew meals they eat at your event](https://www.ticketfairy.com/ru/guides/charge-outside-teams-for-their-crew-meals)
- [Check in attendees and print name badges at your event registration desk](https://www.ticketfairy.com/ru/guides/check-in-attendees-and-print-badges-at-registration)
- [Set up a self-service check-in kiosk for your event](https://www.ticketfairy.com/ru/guides/set-up-a-self-service-check-in-kiosk-for-your-event)
- [Добавьте всех, кто отправляет форму мероприятия, в список волонтёров, торговцев или технической команды](https://www.ticketfairy.com/ru/guides/add-form-applicants-to-your-event-teams)
- [Все инструкции Ticket Fairy](https://www.ticketfairy.com/ru/guides)

## Сделайте это на своём мероприятии

Создайте аккаунт, соберите мероприятие и выполните шаги в своей панели управления. Звонок в отдел продаж не нужен.

  [Создать бесплатный аккаунт](https://manage.ticketfairy.com/welcome) [Заказать демо](https://www.ticketfairy.com/ru/event-ticketing/book-a-demo)

## Продавайте билеты с Ticket Fairy

Всё из этих руководств доступно в вашей панели с первого дня после регистрации.

- Настройте мероприятие за несколько минут
- Бесплатные мероприятия бесплатны
- Fai, ваш ассистент, уже встроена

 [Создать бесплатный аккаунт](https://manage.ticketfairy.com/welcome)

Без платы за подключение. Без обязательной ежемесячной платы. Банковская карта не нужна.

## Посмотрите на звонке

Запишитесь на демо, и мы покажем, как Ticket Fairy работает с мероприятиями вашего типа.

 [Заказать демо](https://www.ticketfairy.com/ru/event-ticketing/book-a-demo) [Другие возможности Ticket Fairy](https://www.ticketfairy.com/features)

### Советы, как продавать больше билетов

Практические советы организаторов, у которых билеты разлетаются, и каждое новое руководство сразу после публикации.

Мы уважаем вашу конфиденциальность. Отписаться можно в любой момент.
