Menjalankan produksi
Build the running order for your event day
Without one running order, a stage can be promised to two acts at the same hour. Festival and multi-stage promoters hold every stage and every set time for the day on one timeline, where the whole team can see the changeovers.
Lay out every stage and every set of your event day on one timeline, so you can see every set time and every changeover in one running order.
- Untuk
- Running the stages and set times on your event day
- Perlu waktu
- 8 menit
Sebelum mulai
- Event management is switched on for your account. Where it is not, the page tells you.
- You know your stages and roughly who plays where. A timeline with one stage on it is still worth building, because it puts every set of the day in one order.
- You have the times you cannot move: the venue curfew, the noise limit and the hour the crew can start loading in.
-
Open the timeline for the event
Open the event and select Schedule & Timeline.
Catatan: One row per stage and one column per hour, with the day you are looking at above it. A multi-day event keeps a timeline for each day.
The running order, one row per stage. -
Set up your stages first
Open Stages and add each stage, room or screen you programme separately.
Catatan: A stage is any place two things cannot happen at once. A second room, an outdoor area and a workshop tent each earn their own row.
-
Put the sets on the timeline
Add each set to its stage at the time it starts, and give it the length it really runs.
Catatan: A set booked for its billed length with no changeover after it leaves no time to clear the stage. Leave the gap you need between acts.
Load-in, doors and curfew
The timeline is built from set times against stages, so load-in, soundchecks, doors, the curfew and load-out are not on it. Keep those on the task board, where each one can carry an owner and a date, and use the timeline for the question it answers: which act is on which stage, and when.
-
Read the day for clashes
Look along each stage row for two sets booked over each other.
Catatan: The timeline lays out set times against stages, so it shows you a stage double booked. Crew and equipment are not on it, so check those against the crew list yourself.
Coba langkah-langkah ini di acara Anda sendiri
Buat akun gratis, susun acara Anda dan ikuti langkah-langkah di atas di dasbor Anda sendiri. Hanya perlu beberapa menit dan Anda tidak perlu menjadwalkan panggilan penjualan.
Tanpa biaya pemasangan. Tanpa biaya bulanan wajib. Tanpa kartu kredit.
Atau minta dikerjakan untuk Anda
Fai can open the event so you can read the timeline. The running order itself is built and changed in the dashboard today.
Di dasbor Anda, dengan Fai
Open <EVENT NAME> so I can build its running order
Dari asisten Anda sendiri, lewat MCP
Hubungkan asisten Anda ke server MCP kami lalu minta:
Biarkan --read-only dalam konfigurasi MCP Anda. Tugas ini hanya membaca data, jadi asisten Anda tidak memerlukan alat yang membuat perubahan.
Pick the brand, find the event <EVENT NAME> and show it
Dari terminal Anda
Pasang CLI dari halaman CLI kami, masuk dengan ticketfairy auth login, lalu pilih brand yang Anda kerjakan dengan ticketfairy brand use <BRAND_ID>. ticketfairy brand list dan ticketfairy event list menampilkan ID yang digunakan perintah lain.
Read the event the timeline belongs to.
Show the event and its dates
ticketfairy event get <EVENT_ID>
Biarkan Fai mengerjakannya untuk Anda
Fai bekerja di dalam dasbor Ticket Fairy Anda. Buat akun Anda, buka Fai dan tempel perintah di atas.
Tanpa biaya pemasangan. Tanpa biaya bulanan wajib. Tanpa kartu kredit.
Keep the day current as it changes
-
Move a set rather than rewriting the day
Change the set that moved and leave the rest alone.
Catatan: Everyone reading the timeline sees the change, which is the point of keeping it in one place rather than in a document each person copies.
Fai can open the event so you can move the set yourself. Set times are changed on the timeline in the dashboard today.
Di dasbor Anda, dengan Fai
Open <EVENT NAME> so I can move a set on its running order
Dari asisten Anda sendiri, lewat MCP
Biarkan --read-only dalam konfigurasi MCP Anda. Tugas ini hanya membaca data, jadi asisten Anda tidak memerlukan alat yang membuat perubahan.
Pick the brand, find the event <EVENT NAME> and show it
Dari terminal Anda
Read the event back.
Show the event and its dates
ticketfairy event get <EVENT_ID>
Pertanyaan yang mungkin Anda punya
- How many stages can one day hold?
- As many as you programme. Each one is a row, and the timeline scrolls rather than squeezing them together.
- Can a set run past midnight?
- Yes. A set that crosses midnight stays on the day it started, which is how the people working it think about it.
- Does the timeline tell buyers anything?
- No. It is your production plan. What buyers see is your event page and their ticket, which are set up separately.
Masih ada pertanyaan?
Jadwalkan demo dan kami akan menjawabnya lewat panggilan, sesuai jenis acara Anda. Atau buat akun Anda dan lihat sendiri.
Tanpa biaya pemasangan. Tanpa biaya bulanan wajib. Tanpa kartu kredit.
Panduan terkait
Lakukan ini di acara Anda sendiri
Buat akun, susun acara, dan ikuti langkah-langkahnya di dasbor Anda. Anda tidak perlu memesan panggilan penjualan.